ha
ha

My Phuoc 2 Industrial Park

Investor

Industrial Investment and Development Corporation - One member Company Limited (Becamex IDC)

* Management office:

  • Address: My Phuoc Ward, Ben Cat Town, Binh Duong
  • Tel: (0274) 3822 655 - 3811 777; Fax: (0274) 3822 713 - 3811 666
  • Email: thuanvn1979@becamex.com.vn - naklang@becamex.co.kr
  • Website: www.becamex.com.vn - www.becamex.co.kr

District

Ben Cat

City/Province

Binh Duong

Location

Ben Cat, Binh Duong

  • Distance to :
  • - Ben Thanh Market:
  • - Mien Dong Coach Station:
  • - Cat Lai Port:
  • - Thanh Phuoc Port:
  • - Binh Duong Port:
  • - Thu Dau Mot Market:
  • - Nha Be Petroleum Port:
  • - Cai Mep Petec Oil Port:
  • - Moc Bai Gate:
  • - Tan Son Nhat International Airport:
Scope of investment

Food processing industry, food. Agro-forestry processing industry products. Clothing industry. Textile industry. Industrial production art furniture. Industrial electronics, industrial electricity and electrical appliances. Manufacturing construction engineering machinery. Industry production of pharmaceuticals, agricultural chemicals and veterinary drugs. Plastics manufacturing industry. Footwear industry. Paper and packaging industry (no pulp). Industrial production sports instruments. Industry production of optical instruments, medical instruments. Industrial production of building materials.

List of customers

Tatung Viet Nam Ltd,.Co, Orion Vina food Ltd,.Co

Total area

477.39 Ha

Infrastructure

Infrastructure in the industrial park was basically a good investment, convenient road traffic, ports, rail.

Land Usage Structure

Type of land Area (ha) Ratio (%)
Land for plant construction 331,28 69.39
Land for warehouses 1,69 0.35
Land for construction works and services 10.60 2,22
Land of trees, canals 45,68 9,57
Lake Air 2,42 0.51
Sewage treatment plant 1,68 0.35
Water supply station 1,69 0.35
Power station 5,33 1,12
Land transport 68,70 14,39
Land of electricity protection corridors 8,33 1,74
TOTAL 477,39 100

Weather

Tropical equatorial nature, year-round temperatures, high humidity and abundant light source.

Traffic Network

System of roads and internal roads completed 25 - 62 m wide. Asphalt concrete pavement load 40 - 60 / tons

Electricity supply system

Station transformer 500MAV and 22KV grid supply to the plot boundary.

Water supply system

Piping systems from Ø 27 to Ø 800 form a closed loop water supply of the whole area, leading directly to each plant to ensure adequate water supply pressure and flow capacity of the water supply of about 80,000 m3/day.

Sewage treament

Centralized wastewater treatment plant with a capacity of 16,000 m3 / day and ensure to receive and process standards TCVN 5945:2005, column A before discharge into the river.

Telecommunication system

Telephone system installation to the boundaries of the land and provide full customer demand, unlimited number. Optical system can be connected to telecommunication applications and leased systems.IDD telephone, VoIP, ADSL

Public ultilities

In the industrial zone is two separate drainage system, a drainage system and a system of industrial wastewater

Price

45.00 USD/M2

Electricity tariff

According to EVN's price

Water tariff

Under the current provisions of the PPC

Sewage treatment tariff

Under the provisions of the provincial People's Committee and of the Management Board of Industrial Zones

News and Events

Leave a message

Leave a message

Your email address will not be published. Required fields are marked *

SEND